HSE – No LTI’s, reportable injuries or incidents.
Scope of Work
- In house fabrication of 3CR12 Dipseal and carbon steel draglink conveyor – all fabricated to tight tolerances over 24+ meter lengths
- On site removal and disposal of Draglink conveyor and Dipseal using bespoke inhouse designed jacking and skating solutions to remove existing and install the new
- Installation on site of both units 1 and 2
- Removal and installation methodology designed by Sync Lift Engineering reduced the replacement duration by 5 days per unit